Oil, gas & petrochemicals

Asset integrity you can prove, from the wellhead to the tank farm

In oil, gas and petrochemicals, a missed inspection can become an incident. Mintema keeps every pipeline, vessel, tank and pump inspected, maintained and monitored, with the evidence auditors and regulators expect.

Take the tour
01Register

Every line, vessel and tank with its integrity data

What you get
  • Site, unit, system, item

    Facilities broken down to each tag.

  • Integrity fields, no code

    Design data, materials and limits on each item.

  • Pipelines on the map

    Routes, valves and crossings in GIS.

Unit 200
Vessel V-201Design 18 barIn date
Line 6-P-1021Corrosion loop CL-4Watch
Tank TK-11Floating roofIn date
Pump P-204AAPI 610Running
Every tag, one registerIllustrative
Next stop · 02Inspect
02Inspect

Integrity inspections on time, with evidence

What you get
  • Your inspection methods

    Thickness, visual, CUI and tank inspections.

  • Readings with limits

    Corrosion rates and remaining life calculated.

  • Engineer approval

    Results and next dates set after review.

Thickness survey
FieldUT readingsLimitsCheckedReviewEngineerNext dateSet
Evidence on every itemIllustrative
Next stop · 03Manage risk
03Manage risk

Inspection plans driven by risk

What you get
  • Risk per item

    Likelihood and consequence rank every tag.

  • Plans that follow risk

    Higher risk, earlier inspection.

  • Findings tracked to close

    Every anomaly with an owner and a date.

Open findings
Line 6-P-1021Thinning near limitRepair
Tank TK-14Roof seal damagePlanned
Vessel V-201No findingsClear
No finding left openIllustrative
Next stop · 04Maintain safely
04Maintain safely

Work done safely, with permits and isolations

What you get
  • Permits to work

    Hot work and confined space signed before start.

  • Planned and corrective work

    Linked to the tag and its history.

  • Critical spares

    Seals, valves and parts tracked and reserved.

Safe job
RequestP-204APermitHot workIsolationSignedWorkClosed
Safety steps on the recordIllustrative
Next stop · 05Watch live
05Watch live

Corrosion, vibration and levels watched live

What you get
  • Sensors on the tag

    Corrosion probes, vibration and tank levels.

  • Rules on readings

    Trends raise alerts and inspections.

  • Control room alerts

    Alarms by severity, with every response recorded.

Live readings
Corrosion probe CP-70.31 mm/yrWatch
P-204A vibration2.4 mm/sNormal
Tank TK-11 levelHigh-highAlarm
Readings on the right tagIllustrative
Next stop · 06Shutdowns
06Shutdowns

Turnarounds delivered on time and on budget

What you get
  • Scope from findings

    Inspection results build the work list.

  • Progress dashboards

    Work, permits and cost each day.

  • Compliance reports

    For regulators, insurers and auditors.

Turnaround progress
Inspections78%
Repairs61%
Permits closed84%
Shutdown under controlIllustrative
Journey completeSee everything you gain
At a glance

Everything you gain, at a glance

  1. One integrity register

    for every tag

  2. Inspections in date

    with evidence

  3. Risk-based plans

    that focus effort

  4. Safe work

    with permits and isolations

  5. Live warnings

    from corrosion and vibration

  6. Proof for auditors

    always ready

Getting started

Start with one unit, grow across your sites

A typical rollout. The scope and timing are agreed with you.

  1. Month 11

    First unit

    Tags and integrity data of one unit loaded.

    • Asset import
    • Integrity fields
    • Teams
  2. Months 2-32

    Inspections and risk

    Inspection methods, risk ranking and findings.

    • Methods
    • Risk
    • Findings
  3. Months 3-63

    Work and monitoring

    Permits, maintenance and live readings.

    • Permits
    • Spares
    • Sensors
  4. Ongoing4

    All sites

    More units and sites with turnaround planning.

    • All sites
    • Turnarounds
    • Compliance
FAQ

Oil, gas & petrochemicals, answered

Have a question that is specific to your organisation? A solution engineer will answer it against your own assets, processes and data.

Yes. Inspection types, readings, limits and calculations are configured to match your procedures.

Yes. Each item carries likelihood and consequence, and inspection plans follow the risk.

Yes. Permit steps and signatures are part of the work order before work starts.

Yes. Every reading, approval and change is kept with its author and time.

A WORKING SESSION

Your integrity programme,
proven.

We will load one of your units, run a thickness survey and show the next inspection date set on its own.

Talk to sales